• FEDERALLY FUNDED PROJECTS •

Ft. Irwin UAS Hanger

Ft. Irwin, CA

General Contractor:

Cox Construction

Project Status:

Completed

Project Scope IncludeD:

Approx 10,000' of site utilities, including domestic water, fire water, sewer, storm drain and natural gas piping.

General Contractor:

Southwestern Dakotah Inc.

Project Status:

Completed

Project Scope Included:

Installation of 16" fire riser with PIV and 12" fire riser with PIV with concrete/asphalt removal and replacement.

MCAGCC P126

29 Palms, CA

General Contractor:

RA Burch

Project Status:

Completed

Project Scope Included:

The installation of storm drain piping up to 36" with multiple structures, and the installation of underground HTHW piping with tie ins to exiting buildings.

General Contractor:

Cyber Professional Solutions

Project Status:

Completed

Project Scope IncludeD:

Installation of 8" domestic water main, 10" storm drain, multiple 8" fire risers with backflow, fire hydrants and post indicator valve.


General Contractor:

RA Burch

Project Status:

Completed

Project Scope IncludeD:

Installation of 8" fire main with backflow, post indication valve, fire department connection and fire riser.


MCAGCC MOFA

29 Palms, CA

General Contractor:

TB Pennick & Sons

Project Status:

Completed

Project Scope IncludeD:

Installation of new communications vaults intercepting existing conduits as well as the installation of new 4" conduit runs up 5th and 6th street.


General Contractor:

Cox Construction

Project Status:

Completed

Project Scope Includes:

Approx 12,000' of site utilities including sewer, water, storm drain, fire suppression and bio-retention basins.


• STATE FUNDED PROJECTS •

General Contractor:

Seto Construction

Project Status:

Completed

Project Scope Included:

Over excavation for new building, site rough/final grading as well as storm water retention area with rock lined swale.


General Contractor:

Ledesma and Meyers

Project Status:

Completed

Project Scope Included:

Approx 10,000' of site utilities and multiple underground storm water retention areas.


General Contractor:

Neff Construction

Project Status:

Under Construction

Project Scope Included:

Approx 20,000' of site utilities for a new elementary school in Menifee,Ca. On site Storm drain included the the installation of up to 30" RCP with pre manufactured radiuses as well underground Bio Retention area.


General Contractor:

Empyren Plumbing

Project Status:

Completed

Project Scope Included:

Installation of an underground MC-3500 storm chamber system, up to 18" storm drain piping, 8" sanitary sewer system and 8" fire main.


General Contractor:

Coachella Valley Water District

Project Status:

Completed

Project Scope Included:

Installation of 1200LF of 12" DIP water main, fire hydrants, air-vacs, water meter, PRV and tie-ins to existing water mains.


Community Day School

Santa Ana, CA

General Contractor:

Balfour Beatty

Project Status:

Completed

Project Scope Included:

Installation of 6" backflow, PIV, PVC fire main and building riser.


Garner Valley Fire Station #56

Garner Valley, CA

General Contractor:

Valley Pipeline Inc.

Project Status:

Completed

Project Scope Included:

Installation of new septic system with lift station and 300LF of leach line.


• PRIVATELY FUNDED PROJECTS •

Mountain View Estates

Thermal, CA

General Contractor:

Desert Empire Homes

Project Status:

Completed

Project Scope Included:

Installation of IID, Verizon and Time Warner conduit for 90 lots.

Cameron Tract

Palm Springs, CA

General Contractor:

Davidson Communities

Project Status:

Completed

Project Scope Included:

Installation of wet and dry utilities for a 100 lot Town Home Tract in Downtown Palm Springs. Project difficulties included major street crossing across Highway 111.

General Contractor:

Valley Pipeline

Project Status:

Completed

Project Scope Included:

Installation of wet and dry utilities for a 40 unit lodging site as well as septic system for future sky diving training facility to train US Navy SEALS.

FedEx

Palm Springs, CA

General Contractor:

Pence Contruction

Project Status:

Completed

Project Scope Included:

Installation of aprox 4,000' of off site 12" DIP water main, fire hydrants, water services, blow offs and existing ties ins. Project difficulties included major traffic control and a 30" direction bore through Cal Trans Right of Way. Valley Pipeline self performed all concrete and asphalt replacement with full lane width grind/overlay as well as traffic striping.

Andalusia Country Club

La Quinta, CA

General Contractor:

TD Desert Development

Project Status:

Under Contruction

Project Scope Inludes:

Dry Utility lot line adjustments for 30 lots. Dry utility hookups for 60 lots. Raising of manholes and valve cans to final grade. Directional boring for 30 new gas services.


General Contractor:

Eleven Western Builders

Project Status:

Completed

Project Scope Inluded:

Approx. 2500' of dry utility excavation. Tie ins to existing IID vaults/power poles and major street crossings for natural gas tie ins.


The Trees HOA

Riverside, CA

General Contractor:

Valley Pipeline Inc.

Project Status:

Completed

Project Scope IncludeD:

The replacement of approx 2600' of water main with 90 services within an existing community.


General Contractor:

Lion Electrical

Project Status:

Completed

Project Scope IncludeD:

Installation of new fire/domestic water services and sewer lateral crossing Indio Blvd.